Tags:
create new tag
view all tags

Backlinks to FunctionalRequirements in Keck/NGAO Web (Search all webs)

Results from Keck/NGAO web retrieved at 02:23 (GMT)

Keck NGAO Team Meeting #6 9:00 a 6:00 p (Pacific Daylight Time) Wed, April 25 and Thurs, April 26, 2007 Center for Adaptive Optics, UC Santa Cruz Telecon attendees...
WBS 3.1.3 Kickoff Meeting Meeting Materials NGAO Architecture Taxonomy.pdf: A shorthand nomenclature for discussion of potential NGAO architectures R. Dekany...
Keck NGAO Team Meeting #8 9:00 a 6:00 p (Pacific Daylight Time) Mon, July 9 to Fri, July 13, 2007 Center for Adaptive Optics, UC Santa Cruz Telecon attendees...
Keck NGAO Team Meeting #9 10:00a 3:30p PDT Friday, August 24, 2007 Tele/Videoconference Dial in Number: 877 280 4645 Passcode: 540030 Videoconference IP...
Keck NGAO Team Meeting #10 8:00a 6:00p Monday, September 17, 2007 012 Robinson Laboratory, Caltech Telecon attendees: 877 280 4645 passcode 540030 (video status...
Keck NGAO Team Meeting #11 9:00a 6:00p PST (note change from PDT to PST on Nov. 4) 7:00a 4:00p HST Monday, November 5, 2007 Tele/Videoconference Dial in...
Keck NGAO PD Team Meeting #8 11:00a 01:00p PDT 08:00a 10:00a HST Wednesday, September 2, 2009 Tele/Videoconference Dial in Number: 877 280 4645 Passcode...
Keck NGAO PD Phase LGS WFS Mini Review 10:00a 02:00p PDT 08:00a 12:00p HST Monday, December 7, 2009 Tele/Videoconference Dial in Number: 877 280 4645 Passcode...
AO System Design Effort (WBS 3.2 3.3), System Design Phase PDR Phase Opto Mechanical Design page Opto Mechanical Mini Design Review, Nov 2009 Management...
NGAO Controls Systems Home Page NGAO Background Information Multi Systems Command Sequencer (MCS) SW Architecture Work (KCSF) Control Systems Software Preliminary...
NGAO Background Information From Controls Team Meetings Kickoff meeting, Aug 5, 2008 Slides Intro to AO, Aug 28, 2008 https://www.oir...
AO System Diagnostics (WBS 3.2.3.9, WBS 3.2.3.10, WBS3.2.12) Integrated with AO (WBS 3.2.3.9) Proposed subsystems Radiometric calibration of instrument and...
NGAO Electronics Architecture Mini Design Review, 26 January 2010 Review Schedule Material to web site: 15 Jan Response from reviewers due: end of day...
NGAO Performance Flowdown Worksheets A performance flowdown is the allocation of error terms to constituent subsystems or components Update (4/25/10): The performance...
Sean Adkins Request: Be prepared to discuss the current state of the art for low noise CCD detectors and the outlook for future performance improvements in this...
NGAO Keck Adaptive Optics Notes Quick link to 2013 MSIP proposal page Complete List of Keck Adaptive Optics Notes KAON Summary by Category Technical...
PD Phase Functional Requirements PD Requirements Review Phase II March 2010 Goals The NGAO project will finalize the System and Functional requirements over the...
Near IR Tip Tilt Sensor Preliminary Design Review (PDR): Date: Monday, April 25, 2011 Time: 12:00pm 6:00pm PDT/ 9:00am 3:00pm HST Reviewers: Corinne...
NGAO Systems Engineering Group Twiki Page A. Mini Design Reviews Actions Lists This list tracks outstanding action items from the PD phase NGAO mini reviews...
NGAO Proposal WBS Dictionary (Goal is a dictionary entry for each line of the WBS; make no entries here, rather submit to Peter by email) 1 System Design Phase...
1 Project Scope: Enabling front page astronomical science by designing, building, and deploying the world`s most advanced astronomical adaptive optics instrumentation...
NGAO System Design Phase Work Packages Link to all NGAO KAON`s All Work Packages listed here require a Scope Planning Sheet, unless otherwise noted WBS Work...
Number of topics: 22

 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback